Before & After Photos

Click on a photo to enlarge.

Leaning Foundation Wall Repair in Hooksett, NH

Notice in the before photo, a homeowner in Hooksett, NH faced concerns with their foundation wall leaning one inch inward. This common issue signaled a need for robust intervention. To restore the wall's integrity, we expertly installed seven GeoLock Wall Anchors. As shown in the after photo, the anchors' advanced design pushed against unstable conditions, halting further inward movement. These heavy-duty steel anchors, embedded in stable soil, provide a permanent solution capable of doing more than halting problems—it straightens walls over time, ensuring durability and instilling peace of mind.

Failing Floor Support Solutions in Hooksett, NH

We recently addressed a significant structural issue for a homeowner in Hooksett, NH, where wooden support posts failed, causing their floor to slope noticeably toward the middle. As shown in the "before" photo, the inadequate support jeopardized the integrity and safety of the home. Our expert team installed the SmartJack® System, providing a secure and stable solution. The "after" photo reveals how the galvanized steel columns, placed strategically on a strong base, lifted and stabilized the floor efficiently. This installation restored the home’s safety and structural integrity.

Sagging Floors in Maynard, MA

This home built in the 1920's was dealing with sagging beams and floor joists, which ultimately led to cracking plaster in the home above. The old columns and posts in the basement were replaced with SmartJacks, which were then raised to stabilize the floor system above.

Replacing Old Temporary Post in Basement, Maynard, MA

A homeowner in Maynard, Massachusetts wanted to replace the temporary posts in their basement. They decided to call Erickson Foundation Solutions about a free inspection.

A Design Specialist arrived at the home and inspected the temporary posts. The Design Specialist recommended that the posts should be replaced.

The EFS crew came to the home and installed 4 SmartJacks into the basement.

Sloping and Separating Floors, Maynard, MA

A homeowner in Maynard, Massachusetts, had sloping and separating floors on their main level. Our production team installed 6 3' SmartJacks with 17 feet of supplemental beam. The supports and the beam will help lift and aid the main floor.