SmartJacks Lift Sagging Foundation in Ehrhardt, SC

This Ehrhardt, SC homeowner became concerned about the longevity of his home's foundation when he noticed his floors sagging. He called Lowcountry Foundation Repair to schedule a free appointment with one of our inspectors. 

Our inspector suggested that he have his foundation lifted back to place with our SmartJack system, a galvanized steel column support that lifts sagging floor joists. The homeowner's floor beams became too weak to stabilize the foundation, so we also replaced the beams with our heavy-duty steel PowerBrace beam. 

After two days of installation, the project was complete and the homeowner was more than pleased with the results! 

Ehrhardt, SC Sagging Floor Support

This home in Ehrhardt, SC had sagging floors from insufficient support in the crawl space. There were some existing light-duty jack posts in the crawl space, but they were not effective in providing support long-term. Our team was able to help solve the issue by installing a SmartJack Support System.

Floor Support in Ehrhardt, SC

This home in Ehrhardt, SC had issues with the floor being unlevel. Our team was able to help resolve the issue with the installation of a SmartJack Support System to stabilize and help level the floor.

Sagging Floors Reinforced in Pineland, SC

This home in Pineland, SC was showing signs of sinking. This concerned the homeowner. They decided to call Lowcountry Foundation Repair to fix the issue. The recommended custom solution given was to install a SmartJack System to support the foundation.

Lowcountry Foundation Repair Installs New Subfloor in Rincon, GA

This homeowner in Rincon, GA had a problem with the floor in one area of the home. Water had damaged the joists beneath the subfloor, weakening it, and allowing the floor to sag. Before installing additional crawl space support pillars (SmartJacks), the subfloor needed to be replaced.

Lowcountry Foundation Repair first sent out the team to the house to replace the wood. After the woodworking was complete, the team installed SmartJacks to support the newly installed joists and subfloor.