Slow Settlement in Garage, Atkinson, NH

A homeowner in Atkinson, New Hampshire, had seen cracks and slow settlement in their garage. EFS installed PolyLevel and NexusPro to the slab to lift, level, and seal the garage slab. 

PowerBrace, Wilmington, MA

This homeowner in Wilmington, Massachusetts was experiencing some cracking and leaning of their foundation walls. Design Specialist Kyle Jamerson came out to the home and inspected all of the areas in question. Kyle suggested that they seal the cracks with Crack Seal and install PowerBraces to secured and strengthen the wall.  Crew Lead Spencer Ladd and his team came to the home and sealed the cracks and installed the PowerBraces to strengthen the foundation of the home. 

Sagging Floors, Lawrence, MA

The floors in this home were sagging and settling more and more over time. The owners had been using temporary supports to minimize the damage, but eventually needed a more permanent solution. Erickson Foundation Supportworks installed several Smart Jack posts to address the issue. The homeowner then had a carpenter come in to help renovate the lower level of them where the ceiling and floor were affected. 

Wall Bugling Significantly, Lawrence, MA

A homeowner that has only lived in their home for 6 months has found that one of the foundation walls in the basement is bulging and letting water in. They called EFS for a free inspection. The Design Specialist inspected and recommended installing an Auxiliary Wall.

Warehouse Floor has Settled, Needs to be Lifted, Lawrence, MA

This commercial property in Lawrence, Massachusetts was experiencing some settlement on the warehouse floor. The owner would like to have the settled part of the warehouse floor lifted back to level. They decided to call EFS for an inspection. 

Design Specialist John Prince inspected the area where the settlement is occurring. After a careful assessment of the warehouse floor, John recommended PolyLevel to level the settled area. 

Crew Lead Nick Melo and his team arrived at the warehouse and injected PolyLevel under the slab and leveled the warehouse floor.